Industrial
Vertex Industrial Shed
Chennai, Tamil Nadu · Completed 2024

Pre-engineered steel warehouse with 15,000 sq ft covered storage.
- Built-up area
- 15,000 sq ft
- Structure
- PEB steel frame
- Duration
- 8 months
- Location
- Chennai, Tamil Nadu
- Handed over
- 2024
Planning something similar?
Tell us the plot size and the timeline and we will come back with a costed approach for a industrial build like this one.
Or call +91 90000 00000
More like this
Other industrial projects
Industrial Northgate Logistics Hub
Ahmedabad, Gujarat · 2022
Distribution facility with loading docks and heavy-duty flooring.
- Built-up area
- 92,000 sq ft
- Structure
- PEB steel frame
- Duration
- 11 months
Ready to start your construction project?
Talk to our civil engineering team for a free site assessment and estimate.